Fireproof Spray Coating


Refractory Spray Coatings I. Main Product Types Lightweight Spray Coatings (LD Series) Density: 0.8–1.8 g/cm³ Operating Temperature: 600–1200°C Key Components: Clay-based materials / Ceramic proppants / Perlite Medium-Weight Spray Coatings (MD Series) Density: 1.8–2.1 g/cm³ Operating Temperature: 1200–1400°C Aggregate: High-alumina bauxite + mullite Heavy-Weight Spray Coatings (HD Series) Density: ≥2.1 g/cm³ Operating Temperature: 1400–1600°C Aggregate: Corundum / Silicon Carbide II. Production Process Raw Material Pre‑Processing & Intelligent Grading System: Aggregate particle size ≤ 5 mm (with 3–5 mm accounting for 30%) Nano Additives: Enhance adhesion to 92% Formula Optimization & Binder System: Low Temperature: Phosphate / Water Glass Medium Temperature: Aluminate Cement High Temperature: Silica Sol + Ultrafine Powder III. Applications Typical Application Scenarios & Technical Benefits: Steelmaking & Metallurgy: Repair of hot blast stove ducts – construction time reduced by 70% Cement Industry: Maintenance of the transition zone in rotary kilns – service life extended to 3 years Power Generation: Wear-resistant lining in CFB boilers – wear rate reduced by 60% Petrochemicals: Repair of the radiant section in cracking furnaces – thermal shock resistance improved by 50% IV. Performance Advantages Compared with Traditional Bricklaying Construction Efficiency: 10 m³/h vs. 2 m³/8h (manual work) Integrity: Seamless joints, with air tightness improved by a factor of three Economic Analysis: Material Utilization Rate: 85–90% (rebound rate ≤ 10%) Total Cost: 40–50% lower than prefabricated components V. Physicochemical Specifications 1. General Performance (HD Series): - Bulk Density: 2.2 ± 0.1 g/cm³ (GB/T 2997–2025) - Compressive Strength: ≥45 MPa (after drying at 110°C) High-Temperature Properties: - Linear Change: ≤1.0% (at 1400°C for 3 hours) - Thermal Conductivity: 1.8 W/(m·K) at 1000°C Construction Parameters: - Initial Setting Time: 15–30 minutes (adjustable) - Adhesion Strength: ≥1.5 MPa (after 24 hours)

Refractory Spray Coating

I. Main Product Types

  1. Lightweight spray coating ( LD Series)
  • Density: 0.8–1.8 g/cm³
  • Applicable temperature: 600–1200℃
  • Main ingredient: Clay-based /Clay pellets/Perlite
  1. Medium- and Heavy-Weight Spray Coatings ( MD Series)
  • Density: 1.8–2.1 g/cm³
  • Applicable temperature: 1200–1400℃
  • Aggregates: High‑alumina bauxite +Mullite
  1. Heavy-duty spray coating ( HD Series)
  • Density: ≥2.1 g/cm³
  • Applicable temperature: 1400–1600℃
  • Aggregates: Corundum /Silicon carbide

2. Production Process

  1. Raw Material Preprocessing
  • Intelligent Grading System: Aggregate Particle Size ≤ 5 mm (with 3–5 mm accounting for 30%)
  • Nano Additives: Enhance Adhesion to 92%
  1. Formula Optimization
  • Binder system:
    • Low temperature: Phosphates /Water glass
    • Medium Temperature: Aluminate Cement
    • High Temperature: Silica Sol +Micro powder

III. Applications

Application Fields

Typical scenarios

Technical Benefits

Iron and Steel Metallurgy

Blast Furnace Hot Air Duct Repair

Construction period shortened by 70%.

Cement Industry

Rotary Kiln Transition Zone Maintenance

Lifespan extended to 3 years.

Power Industry

Wear-Resistant Lining for CFB Boilers

Wear rate reduced by 60%

Petroleum and Chemical Industry

Repair of the Radiation Section of the Cracking Furnace

Thermal shock resistance increased by 50%.

4. Performance Advantages

  1. Compared with traditional masonry
  • Construction Efficiency: 10 m³/h vs 2 m³/8h (manual)
  • Integrity: Seamless, enhanced airtightness 3 times
  1. Economic Analysis
  • Material utilization rate: 85–90% (bounce rate ≤ 10%)
  • Overall cost: Lower than prefabricated components. 40–50%

V. Physicochemical Indicators

1. General Performance ( HD Series):

- Bulk density: 2.2 ± 0.1 g/cm³ ( GB/T 2997-2025 )

- Withstand Voltage Strength: ≥45MPa ( 110℃ Drying)

  1. High-Temperature Properties:

- Rate of change of the line: ≤1.0% ( 1400℃ × 3 hours )

- Thermal conductivity: 1.8 W/(m·K) at 1000℃

  1. Construction Indicators:

- Initial setting time: 15-30min (Adjustable)

- Adhesion strength: ≥1.5 MPa ( 24h )


Keywords:

Fireproof Spray Coating

Online Message

* Note: Please make sure to fill in the information accurately and keep communication open. We’ll get in touch with you as soon as possible!

Submit

Related products

Online Message

* Note: Please make sure the information you provide is accurate and up-to-date, and keep your communication channels open. We’ll get in touch with you as soon as possible.

Submit